Megawatt Path • Modular Infrastructure Planner
Plan the infrastructure path before requesting pricing.
Define the deployment, target IT load, power requirements, resilience, cooling, connectivity and site conditions. Megawatt Path converts the profile into a preliminary infrastructure scope for technical review, coordinated RFQ and project advancement.
Infrastructure Scope Advisor
Answer a few project questions to generate a directional starting scope before configuring the modular infrastructure package.
Project Profile
This planning tool creates a directional scope from your inputs. Final engineering, equipment selection, pricing and delivery requirements require project-specific review.
Configure the Modular Infrastructure Scope
Select the deployment, power approach, supporting systems and connectivity/site items that belong in the preliminary scope. Your selections will populate the technical review request.
Standard 1MW Shell
Prefab modular hall for fast deployment, up to 1MW.
Edge 500kW Shell
Compact, fast-deploy edge facility.
Hyperscale 5MW Hall
Large-scale modular hall with expandable design.
15kV Substation
High-capacity substation for grid connection.
Battery Energy Storage
Two-hour lithium-ion storage for redundancy.
Diesel Generator 1MW
Backup generation for N+1 redundancy.
In-Row Cooling
Smart sensors and efficient rack-adjacent cooling.
CRAC Unit
Precision cooling and humidity control.
Fire Suppression
Clean agent protection for IT environments.
Smart Rack PDU
Remote metering and monitoring.
Fiber Cross-Connect
Carrier-neutral link for redundancy.
NOC Console
Centralized visibility for power and cooling.
Site Prep & Civil Work
Foundation, grading, and pad-ready site prep.
Your Preliminary Infrastructure Scope
Planning Note
Directional planning, not engineered design.
This planner organizes a preliminary project scope for discussion. Capacity, utility service, voltage, redundancy, equipment selections, cooling architecture, civil requirements, lead times, pricing, financing, installation and commissioning must be validated for the specific site and project by the appropriate qualified parties.